| LOCATION |
DURATION |
WORK COMPLETED |
COMMENTS |
| Waterloo, ON |
6 hours |
390 vertical feet of continuous soil sampling (various boreholes) using the MacroCore sampler |
GeoprobeŽ World Record, published in
Spring 2002 “Geoprobe Probing News” |
| Cambridge, ON |
2 days |
Conducted 75-foot deep screen point bores in difficult/dense conditions |
Screen point sampler used |
| Milford, MI |
1 day |
Completed the installation of 22 injection wells (15 foot depth) |
Dual Tube system utilized |
| Wallaceburg, ON |
15 days |
Completed the installation of 310 injection wells (12 foot depth) |
Dual Tube system utilized |
| Dayton, OH |
1 day |
Three 90-foot borings |
Using MIP screening tool |
| Dayton, OH |
1 day |
570 vertical feet of water sampling
(various depths) |
Screen point sampler used |
| Toronto, ON |
6 days |
145 wells abandoned using proprietory well extraction tooling |
Well extraction tooling developed to remove and abandon wells in accordance with MOE 903 regulations |